Published
ISLAND NEWS · PORT
Tourlos bridge works: vessel passage beneath the span prohibited
A signed Port Fund notice prohibits vessels from passing beneath the New Port access bridge during repair work, from 21 October until a further announcement. It does not close the whole port.
Restriction announced from 21 October · end date not specified
The passage affected
The Municipal Port Fund of Mykonos announced a prohibition on vessels passing beneath the bridge to the access islet at the New Port in Tourlos, beginning on 21 October 2026. Its signed notice, protocol 3037, links the measure to work on the remaining section of the bridge and islet. The notice identifies A. Nikolas E.E. as the contractor. It is a restriction on this passage beneath the bridge; the document does not announce the closure of the whole New Port or a general suspension of ferry services.
The Fund says repairs to the bridge parapet and railings require the restriction for the safety of people passing through and the work crew. It addresses the municipality, port authority, police, customs, fishermen, boat operators and residents. We have read the original notice, but have not inspected the works or independently established the passage’s physical condition.
How long and what to check
The wording says the prohibition applies throughout the relevant works and until a newer announcement. It gives neither a completion date nor an alternative route for particular vessels. The publication date is therefore not an estimated reopening date.
As of our 12 November source check, the Port Fund’s notice remains available on its news page; that alone does not prove the on-site situation has not changed. Skippers and agents planning a movement near the bridge should consult current instructions from the Mykonos Port Authority before relying on the October notice. A later official lifting or modification of the restriction would be the material next update.
Reporting sources
Sources checked: 2026-11-12.
